Pro Renovations built a double extension at a house in West Wickham BR4. We dug the footings to 1.5m then, put in the drainage. We then started work on the damp cores and block work up to the first level. Next we put the 9″x2″ floor joists in and built up to the plate. Next we pitched the roof and tiled it followed by installing the roof windows. Next the electrics and plumbing were installed and plastering was done. Second fix electrics and second fix pluming followed including rads and on suite tiling to shower and around bath. Lastly Pro Renovations Bromley fitted the new kitchen and decorated the inside and out of the new extension.

The Result was a double story extension with extra bedroom and en-suite plus kitchen extension.

 

What Where When Time Taken
Double Story Home Extension West Wickham 2016 16 Weeks